Time and Cost Planning of a Housing Construction Project Using Building Information Modelling

Authors

  • Siddesh pai University of Petroleum and Energy Studies(UPES), National Institute of Construction Management and Research(NICMAR)
  • Amit Shriwas National Institute of Construction Management and Research (NICMAR)

DOI:

https://doi.org/10.30564/jcr.v1i2.1155

Abstract

Conventional ways of building construction process lack proper task scheduling and      planning of the project work at the site resulting in poor monitoring of the whole process. Building information modelling (BIM) creates a platform where all the information of every single element of the construction process can be virtually integrated. The integration of 3D elements of a building model with its scheduled time and cost parameters results in 5D BIM. This feature enables the visualization, scheduling, planning, and monitoring and clash detection of all pre- construction, construction and post-construction processes of a building. The present study used the information of a live project of a traditionally built residential building which was remodelled using 5D BIM technique. The purpose of this study was to compare and analyse the impact of 5D BIM on time and cost parameters of the live project.

Keywords:

5D BIM, Microsoft project, Modelling, Naviswork manager, REVIT, Scheduling, Visualization

References

[1] Mudasir amin chowdary, Dr. Rajendra, vijay .k, vidyashree (2016), Modelling and project planning of a structure by implementing 5d bim technique, ijircce vol. 4, issue 4.

[2] Anil Sawhney, PhD, FRICSAssociate Dean & Director (2016), State of bim adoption and outlook in india, Construction RICS School of Built Environment (RICS SBE), Amity University

[3] By Amol A. Metkari, Dr. A. C. Attar (2015), Application of building information Modelling tool for building project, CRIP vol. 48, issue1.

[4] Peter Smith, Procedia (2015), Project cost management with 5d bim, Social and Behavioral Sciences 226 (2016) 193 – 200.

[5] Azzouz, A., Shepherd, P. and Copping, A (2017), the emergence of building information modelling assessment methods, ijircce vol. 8, issue 4, April

[6] Foroughi, R. (2006). Green construction using BIM. MSc. Thesis.Control Engineering Department. Islamic Azad University of South

[7] Tehran.

[8] Chimple, A., Kheerd, P. and Copping, A (2017), building information modelling and their types, ijircce vol. 8, issue 4, April

[9] Makichu, j. (2006). Advantage in construction using BIM. MSc. Thesis.Control Engineering Department. Islamic Azad University of Sout

Downloads

Issue

Article Type

Articles