Inter-Organizational Conflict (IOC) in Building Refurbishment Projects; an Exploratory Factor Analysis (EFA) approach

Authors

  • Nazanin Nafisi Jinggangshan University
  • Adel Noori Jinggangshan University
  • Mohamadreza Mokariantabari Jinggangshan University

DOI:

https://doi.org/10.30564/jcr.v2i1.2732

Abstract

Over the past years, there has been an expanding intrigued in building refurbishment projects because of the alter in financial conditions and the accentuation on sustainable development. Increasing demand for building refurbishment projects will lead to an increase in organizational interactions in the construction works as building refurbishment works involve interactions among many different organizations and it can cause Inter-Organizational conflict (IOC) among organizations involved in projects. This paper adopted an Exploratory Factor Analysis (EFA) approach to analyses IOC in building refurbishment projects. For this study, a five-point Likert Scale was adopted to ensure the instruments of the study are reliable. The researcher ultimately sent questionnaires as a web-link and email invitation to 1050 construction firms and 733 architectural firms.  The questionnaire sent to managers and professionals from construction and architectural firms in Malaysia. Finally, one-hundred-seventy-nine (179) refurbishment projects formed a database for this paper. The finding of this paper shows the IOC factors that contribute to the improve the performance of building refurbishment project can be conflict during the construction stage, conflict between the client and the consultant, task expectations, basic responsibilities, final duration, project’s goals, conflict between the client and the contractor, final cost, final quality, standards of behaviors, conflict between the contractor and the consultant, interference and conflict during the design stage.

Keywords:

Building refurbishment project, Inter-Organizational Conflict (IOC), Uncertainty, Exploratory Factor Analysis (EFA), Existing Building

References

[1] Acharya, N. K., Lee, Y. D., Kim, J. K. Critical construction conflicting factors identification using analytical hierarchy process. KSCE Journal of Civil Engineering, 2006, 10(3): 165-174.

[2] DOI: https://doi.org/10.1007/BF02824057

[3] Ali, A. A., Au-Yong, C., Au-Yong, C. The designer in refurbishment projects: implications to the compatibility of design. Structural Survey, 2013, 31(3): 202-213. DOI:https://doi.org/10.1108/SS-11-2012-0038

[4] Ali, A. S., Rahmat, I. Methods of coordination in managing the design process of refurbishment projects. Journal of Building Appraisal, 2009, 5(1): 87-98.

[5] Antwi, S. K., Hamza, K. Qualitative and Quantitative Research Paradigms in Business Research: A Philosophical Reflection. European Journal of Business and Management, 2015, 7(3): 217-225.

[6] Arain, F. Potential Barriers in Management of Refurbishment Projects. Journal of Independent Studies and Research, 2005, 3(1): 22-31.

[7] Ashworth, A. Contractual procedures in the construction industry, sixth edition. In Contractual Procedures in the Construction Industry, Sixth Edition. Pearson/Prentice, Hall, 2013.

[8] DOI: https://doi.org/10.4324/9781315847061

[9] Assael, H. Constructive Role of Interorganizational Conflict. Administrative Science Quarterly, 1962,14(4): 573-583.DOI: https://doi.org/10.2307/2391595

[10] Aziz, R. F., Abdel-Hakam, A. A. Exploring delay causes of road construction projects in Egypt. Alexandria Engineering Journal, 2016, 55(2): 1515-1539. DOI:https://doi.org/10.1016/j.aej.2016.03.006

[11] Bachmann, R., Blois, K. K. J., Ivens, B. B. S., candace jones, Lichtenstein, benyamin b., Chan, A., Ho, D. D., Tam, C., Fong, P. P. S., Lung, B. W. B., Goethals, F. G., Ho, D. D., Hsu, M.-H., Ju, T. L., Yen,C.-H., Chang, C.-M., Blois, K. K. J., Ivens, B. B. S.,Laan, A., … Cheung, S. O. Interorganizational Teamwork in the Construction Industry. Administrative Science Quarterly, 2012, 133(February), 157-168.DOI: https://doi.org/10.1061/(ASCE)0733-9364(2007)133:2(157)

[12] Barki, H., Hartwick, J. Interpersonal Conflict and Its Management in Informastion System Development.MIS Quarterly, 2011, 25(2):195-228.DOI: https://doi.org/10.2307/3250929

[13] Bekele, A. Alternative Dispute Resolution Methods in Construction Industry : an Assesment of Ethiopian Situation. A Thesis Submitted To the School of Graduate Studies Addis Ababa University Faculity of Technology, 2015: 1-147.

[14] Cakmak, P., Cakmak, E. An Analysis of Causes of Disputes in the Construction Industry Using Analytical Hierarchy Process (AHP). Ascelibrary. Org,2013:94-102.

[15] DOI: https://doi.org/10.1061/9780784412909.010

[16] Chan, A. P. C., Hon, C. K. H. Safety of repair, maintenance, minor alteration, and addition (RMAA) works : a new focus of construction safety. Routledge, 2016.

[17] Cheung, S. O., Pang, K. H. Y. Anatomy of Construction Disputes. Construction engineering and management, 2013, 139(January), 15-23.DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000532

[18] Cheung, S. O., Yiu, T. W. Are Construction Disputes Inevitable. IEEE Transactions on Engineering Management, 2006, 53(3): 456-470.DOI: https://doi.org/10.1109/TEM.2006.877445

[19] Cheung, S., Yiu, K., Chim, P. How relational are construction contracts? Journal of Professional Issues in…, 2006, January, 48-56.

[20] Creswell. The Selection of Research Design Chapter,2009: 3-22.

[21] David J. Malaysia social media statistics 2014. In Malaysia Asia, 2015.

[22] Deutsch, M. The Resolution of Conflict: Constructive and Destructive Processes. In American Behavioral Scientist, 1973, 17(2):248. Yale University Press. DOI:https://doi.org/10.1177/000276427301700206

[23] Diekmann, J. E., Girard, M. J. Are Contract Disputes Predictable? Journal of Construction Engineering and Management, 1995, 121(December), 355-363.DOI: https://doi.org/10.1061/(ASCE)0733-

[24] (1995)121:4(355)

[25] Edwards, P. J., Roberts, I., Clarke, M. J., Diguiseppi,C., Wentz, R., Kwan, I., Cooper, R., Felix, L. M.,Pratap, S. Methods to increase response to postal and electronic questionnaires. The Cochrane Database of Systematic Reviews, 2009, 3, MR000008.DOI: https://doi.org/10.1002/14651858.MR000008.pub4

[26] Egbu, C. Management education and training for construction work within the construction industry,1994.

[27] Gardiner, P. D., Simmons, J. E. L. Case explorations in construction conflict management. Construction Management and Economics, 1995, 13(3): 219-234.

[28] DOI: https://doi.org/10.1080/01446199500000026

[29] Golembiewski, R. T. Handbook of organizational consultation. Marcel Dekker, 2000.

[30] Gould, N. Dispute resolution in the construction industry : An overview. Construction Law, September,2004:1-34.

[31] Grebici, K., Ouertani, M., Blanco, E. Conflict Management in Design Process : Focus on Changes Impact. 13th ISPE International Conference on Concurrent Engineering, 2006:1-8.

[32] Halac, M., Azoulay, P., Biais, B., Bolton, P., Dessein,W., Gibbons, B., Hagiu, A., Kartik, N., K˝ Oszegi,B., Macdonald, G., Ryall, M. Relationship Building: Conflict and Project Choice over Time a, 2013.

[33] Harmon, K. M. J. Conflicts between Owner and Contractors: Proposed Intervention Process. Journal of Management in Engineering, 2003, 19(3): 121-125.DOI: https://doi.org/10.1061/(AS -

[34] CE)0742-597X(2003)19:3(121)

[35] Hulthén, H. A model of contextual factors and inter-organizational integration: A Grounded Theory study of two supply chains, 2013: 1-228.

[36] Ilter, D. Identification of the relations between dispute factors and dispute categories in construction projects. International Journal of Law in the Built Environment, 2012, 4(1):45-59.

[37] DOI: https://doi.org/10.1108/17561451211211732

[38] Jackson, B. J. Construction Management JumpStart:The Best First Step Toward a Career in Construction Management. Sybex, 2010.

[39] Jefferies, M., Kirk, A., Hampson, A., Mccann, J. Ethical construction procurement. 2003: 254-266.

[40] Jha, K. N. Determinants of Construction Project Success in India. Springer Netherlands, 2013, 23. DOI: https://doi.org/10.1007/978-94-007-6256-5

[41] Jr, L. A., Polkinghorn, B. Managing conflict in construction megaprojects: Leadership and third‐party principles. Conflict Resolution Quarterly, 2008,26(2).DOI: https://doi.org/10.1002/crq

[42] Juan, Y.-K., Kim, J. H., Roper, K., Castro-Lacouture,D. GA-based decision support system for housing condition assessment and refurbishment strategies. Automation in Construction, 2009, 18(4): 394-401.DOI: https://doi.org/10.1016/j.autcon.2008.10.006

[43] Jukuri, K. Identity Projects of Design Professionals-Identity Construction Using Social Media. Aalto University School of Business, 2013.

[44] Julie Pallant. SPSS survival manual: a step by step guide to data analysis using IBM SPSS. In Australian & New Zealand Journal of Public Health (4th ed.).Allen & Unwin, 2013. DOI: https://doi.org/10.1046/j.1365-2648.2001.2027c.x

[45] Kang, B. Developing a Systems Approach for Managing Ethics in Construction Project Environments.ARCOM, 2004, 2(September), 1-9.

[46] Kerzner, H. H. R. Project management: a systems approach to planning, scheduling, and controlling. In New York, 2013. DOI: https://doi.org/10.1016/0377-2217(82)90164-3

[47] Khahro, S. H., Ali, T. H. Causes Leading To Conflicts in Construction Projects : A Viewpoint of Pakistani Construction Industry, 2014: 116-121.

[48] Kohler, N. and Hassler, U. Interdisciplinary architectural research: cultural heritage and resource conservation. Proceedings of the 2 nd Conference ARCCAEEA, 2000, 4-7 July, Paris.

[49] Kumarasswamy, M. M. Conflicts, claims and disputes in construction. Engineering, Construction and Architectural Management, 1997, 4(2): 95-111.DOI: https://doi.org/10.1108/eb021042

[50] Lindhard, S. M., Shen, G. Q., Brunoe, T. D., Larsen, J.K. Factors Affecting Schedule Delay, Cost Overrun,and Quality Level in Public Construction Projects.Journal of Management in Engineering, 2016, 32(1),4015032.DOI: https://doi.org/10.1061/(ASCE)ME.1943-5479.0000391

[51] Liu, T. Conflicting Objectives in Interfaces of Construction Project (Issue June). Norwegian University of Science and Technology, 2014.

[52] Lumineau, F., Eckerd, S., Handley, S. Inter-organizational conflicts. Journal of Strategic Contracting and Negotiation, 2015, 1(1):42-64.DOI: https://doi.org/10.1177/2055563614568493

[53] Mansfield, J. R. What’s in a name? Complexities in the definition of “refurbishment.” Property Management, 2002, 20(1):23-30. DOI: https://doi.org/10.1108/02637470210418942

[54] Mark Klein. Computational conflicts : conflict modeling for distributed intelligent systems, with contributions by numerous experts. In Computational conflicts. Springer, 2000.

[55] Mitkus, S., Mitkus, T. Causes of Conflicts in a Construction Industry: A Communicational Approach. Procedia-Social and Behavioral Sciences, 2014, 110, 777-786.

[56] DOI: https://doi.org/10.1016/j.sbspro.2013.12.922

[57] Molenaar, K., Washington, S., Diekmann, J. Structural Equation Model Of Construction Contract Dispute Potential. August, 2000: 268-277.

[58] Moura, Helder. Managing Stakeholders Conflicts. Construction Stakeholder Managemen, 1997: 286-316.

[59] Moura, HMP, Teixeira, J. Managing stakeholders conflicts. Construction Stakeholder Management,2010: 286-316.

[60] Msallam, M., Abojaradeh, M., Jrew, B., Zaki, I.Controlling Of Variation Orders in Highway Projects in Jordan. Journal of Engineering and Architecture, 2015, 3(2): 95-104.

[61] DOI: https://doi.org/10.15640/jea.v3n2a11

[62] Nakash, R. A., Hutton, J. L., Jørstad-Stein, E. C.,Gates, S., Lamb, S. E. Maximising response to postal questionnaires--a systematic review of randomised trials in health research. BMC Medical Research Methodology, 2006, 6, 5.DOI: https://doi.org/10.1186/1471-2288-6-5

[63] Narh, O. C., Owusu, E. E., Narh, T. J. An Exploratory Study of Professional Conflicts and Disputes within the Construction Industry, 2015, 3(12): 44-65.

[64] Nikolova, N., Möllering, G., Reihlen, M. Trust Building Practices in Client-Consultant Relationship,2014.

[65] Noori, A., Mokariantabari, M. Inter-Organizational Integration (IOI) in Building Refurbishment Projects;an Exploratory Factor Analysis (EFA) Approach. International Journal of Scientific & Engineering Research, 2019a, 10(11): 1361-1366.

[66] Noori, A., Mokariantabari, M. Uncertainties in Building Refurbishment Projects; an Exploratory Factor Analysis (EFA) Approach. International Journal of Scientific & Engineering Research, 2019b, 10(11):1065-1068.

[67] Norušis, M. J. (Marija J. SPSS Professional Statistics 6.1. SPSS Inc, 1994.

[68] Ntiyakunze, S. K. Conflicts in Building Projects in Tanzania : Analysis of Causes and Management Approaches. Royal Institute of Technology (KTH),Stockholm, Sweden, 2011.

[69] Nurulhudaya, A. H. The Standards Forms of Contract and the Contractual Behaviour on the Performance of Refurbishment Projects. Universiti Teknology MARA, 2012.

[70] Rahmat, I., Nordin, H., Ali, A. S. The complexity and performance of housing refurbishment projects/Ismail Rahmat, Hashimah Nordin and Azlan Shah Ali.In Built Environment Journal, 2005.

[71] Ralph Goldman. The Future Catches Up: Arms Control, Peacekeeping, Political Behavior. iUniverse,2002.

[72] Riley, M., Cotgrave, A. Construction technology.Technology of refurbishment and maintenance. Palgrave Macmillan, 2011, 3.

[73] Sambasivan, M., Soon, Y. W. Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 2007,25(5):517-526.

[74] DOI: https://doi.org/10.1016/j.ijproman.2006.11.007

[75] Schultz, D. P., Schultz, S. E. Psychology and work today : an introduction to industrial and organizational psychology. Thomson/Wadsworth, 2010.

[76] Sekaran, U. Research method of business: A skill-building approach. In Writing. Wiley, 2006. DOI: https://doi.org/http://www.slideshare.net/basheerahmad/research-methods-for-business-entireebook-by-uma-sekaran

[77] Senaratne, S., Udawatta, N., Gunasekara, D. Intragroup Conflicts In The Pre Contract Stage. Proceedings of the 38th Australasian Universities Building Education Association Conference, 2013:20-22, November 2013, Auckland, New Zealand.

[78] Sousa-ginel, C. C. J. G. E., Camelo-ordaz, C. Antecedents of relationship conflict in top management teams. International Journal of Conflict Management, 2014, 25(2):124-147.

[79] DOI: https://doi.org/10.1108/IJCMA-06-2012-0054

[80] Spang, K., Riemann, S. A guideline for partnership between client and contractor in infrastructure projects in Germany. Management and Innovation for a Sustainable Built Environment, 2011, June, 20-21.

[81] Ticehurst, G. W., Veal, A. J. 2000 Business Research Methods-A Managerial Approach. Longman, 2000.

[82] Vaaland, T., Håkansson, H. Exploring interorganizational conflict in complex projects. Industrial Marketing Management, 2003, 32(2):127-138.

[83] Vaux, J. S., Kirk, W. M. Relationship conflict in construction management and how it affects performance and profit (Vol. 3684806), 2014.

[84] Verma, V. K. Conflict management. The Project Management Institute, d, 1998:1-12.DOI: https://doi.org/10.1111/j.1365-2702.2010.03557.x

[85] Waddell, D., Jones, G., George, J. Contemporary Management. 2013:805.

[86] Williamson, O. E. Transaction-cost economics : The governance of contractual relations. Journal of Law and Economics, 1979, 22(2):233-261. DOI: https://doi.org/10.1086/466942

[87] Wilmot, W. W., Hocker, J. L. Interpersonal conflict. McGraw-Hill, 2010.

[88] Xiang, P., Zhou, J., Zhou, X., Ye, K. Construction project risk management based on the view of asymmetric information. … Engineering and Management, November, 2012:1303-1311.

[89] DOI: https://doi.org/10.1061/(ASCE)CO

[90] Yang, J., Shen, G. Q., Ho, M. F., Drew, D. S., Chan, A. P. C. Exploring Critical Success Factors for Stakeholder Management in Construction Projects. Journal of Civil Engineering and Management, 2009, 15(4):337-348.DOI: https://doi.org/Doi 10.3846/1392-3730.2009.15.337-348

[91] Yates, D. Can claims and disputes (in construction contracts) be prevented or reduced? Building Journal Hongkong China, June, 2003.

[92] Zainudin, H. A. Research Methodology for Business & Social Scince (1st ed.). UiTM Publication Centre(UPENA), 2010.

Downloads

Issue

Article Type

Articles